Staffel 3

Season 3

Mega Carga

10 Episoden11/08/2020

Episoden

Episode 1
S3 · E1 · 11/08/2020 · 45 min

Carriage 58 - 10 Racing Yachts - Sheet Pile Steel

Kieran struggles to get a 26-tonne train rolling for the first time in 60 years. Colin has 48 hours to load ten valuable racing yachts. Robin Has 5 hours to unload 1500 Tons of Sheet Pile construction steel.

Episode 2
S3 · E2 · 18/08/2020 · 45 min

Jack Up Rig (Part 1) - Darwin - Mining Machine

A heavy lift vessel takes onboard a 23,000-tonne oil rig. Plus, a blanket of fog keeps one of the world's biggest airplanes grounded.

Episode 3
S3 · E3 · 25/08/2020 · 45 min

Satellite - Liverpool Flyover - Wood Ship

Massive machines are brought in to move a raised dual carriage way. Plus, a team race against time to underload a shipment of timber.

Episode 4
S3 · E4 · 01/09/2020 · 45 min

Gantry Cranes (Part 1) - China - Herb Isles - Sand Ship

It's a race against time as six massive container cranes have to be loaded in three days. And, a ferry is in urgent need of repair.

Episode 5
S3 · E5 · 08/09/2020 · 45 min

Rotor - Super Cars - Fertiliser Ship

Craig has 48 hours to get four super cars to Spain. Meanwhile, rain threatens to ruin an incoming shipment of fertiliser worth up to £45,000,000.

Episode 6
S3 · E6 · 15/09/2020 · 45 min

Monopiles (Part 1) King Edward Train

One of the biggest heavy lift vessels in the world is squeezed through a narrow canal in Germany. Plus, a 90-tonne locomotive is loaded onto a truck.

Episode 7
S3 · E7 · 22/09/2020 · 45 min

Jack Up Rig (Part 2) - Melbourne - Boat Doors - Christmas Trees

A 23,000-tonne oil rig needs offloading in Melbourne. Plus, a driver battles bad weather to deliver Christmas trees.

Episode 8
S3 · E8 · 29/09/2020 · 45 min

Gantry Cranes (Part 2) - Miami - Cables - Pastor Pete

In Miami, there are just two days to unload six container cranes. Meanwhile, Martin has to check and store 1,200 metres of mooring ropes.

Episode 9
S3 · E9 · 06/10/2020 · 45 min

New Haven Bridge - Sawn Timber - Flying Fish

Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.

Episode 10
S3 · E10 · 13/10/2020 · 45 min

Monopiles (Part 2) - Spanish Trains - Refuse Bails

The loading of wind turbine sections threatens to capsize a ship. Plus, 3,000 bales of compacted rubbish are shipped to Sweden.